Advertisment

General News

13 October, 2021

Much overdue road signage in time for tourists starts at last

The concrete slabs forming the base for the new road signs were all poured last week on the six roads into St. Arnaud, replacing the old signs. This old sign on the North Western Road shows the extent of damage that had occurred. On the Sunraysia Highway the complete middle of the sign had been demolished

By Sue Hynes

Matthew Donaldson and Brad Organ, after the pouring of the concrete slab.
Matthew Donaldson and Brad Organ, after the pouring of the concrete slab.
Advertisment

Most Popular